CENTRA RNO2 (Keystone Data Center)

source-reported under construction

CENTRA Digital Interconnect

265 Keystone Avenue · Reno · Washoe County · Nevada · 89503

Reported planned 12 MWSource updated 14 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for CENTRA RNO2 (Keystone Data Center).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
CENTRA Digital Interconnect
Address and locality
265 Keystone Avenue · Reno · Washoe County · Nevada · 89503
Official metro area
Reno, NV
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 12 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
14 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001605

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Closed-loopProvider label.
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
2024Provider-reported announcement date.

Provider notes

Water. City of Reno's project FAQ describes rooftop chillers and a glycol-based cooling circuit (propylene glycol, with ethylene glycol in some designs), i.e. a recirculating circuit rejecting heat to air rather than an evaporative tower. TMRPA puts the site at roughly 0.29 acre-feet per MW; Nevada LCB puts expected use at approximately 651,000 gallons a year. A cooling-system change was reviewed at building-permit stage with TMWA confirming no significant increase in water demand.

Community. The City of Reno published a standing FAQ for this project specifically because of 'increased public inquiries', covering noise, construction hours, notification, generator emissions and power-demand growth. Conditions of approval require a 15-ft acoustically absorptive barrier around all rooftop chillers to hold equipment noise to ~43 dBA at the property line against a 53 dBA nighttime ambient.

What the source record says

CENTRA's own facility page advertises 4.4 MW available in Q4 2026, liquid-cooling-enabled to 150 kW per cabinet, air-cooled chillers and a target PUE of 1.35 or better. Capacity figures in circulation conflict (3 MW ramping to 6.67 MW as presented to the Planning Commission in January 2025, versus 12 MW advertised later), so no capacityMw value is asserted here. Site is split-zoned Industrial/General Commercial and not adjacent to residentially zoned land, which is why Reno's residential property-line noise standard does not apply.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-01-15 · source-reported permitted

    Conditional use permit approved by the Reno Planning Commission; no appeals were filed.

    Open cited source →

  2. 2026-06 · source-reported under construction

    Building permit issued after the 2025-09-11 geotechnical approval; more than 30 soils/compaction inspections during footing work, extended-hours concrete pours approved for May and June 2026, and the final setback/soil/compaction letter approved in June 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID centra-rno2-keystone-reno-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by CENTRA Digital Interconnect on its website (captured 28 September 2026)
Name as listed
Reno 2
Operator’s facility code
RNO2
Address as published
265 Keystone Ave, Reno, NV 89503

Lifecycle status is not published for this listing.

Critical IT: 4.4 MW. Scope facility · stated as planned. Critical IT capacity as stated for this facility. Not utility power, generation, or measured load. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 28 September 2026.

Cooling design reported by the operator: N+1 redundancy. Scope facility · design rating as stated. Cooling design redundancy as the operator states it for this facility. Not cooling technology, capacity or load. A design rating is not evidence that the facility is operating. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 28 September 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page → captured 28 September 2026

Matched to this licensed row on the operator’s facility code RNO2, within 1 km.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001605

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 265 Keystone Avenue, Reno, NV 89503 · Washoe (Approximate location)

Roles

  • Operator: CENTRA Digital Interconnect

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2024

    Provider-reported announcement date.

  • Status history: 2025-01-15 · source-reported permitted

    Status history supplied by the source.

  • Status history: 2026-06 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 12 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →