This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for CENTRA RNO2 (Keystone Data Center).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- CENTRA Digital Interconnect
- Address and locality
- 265 Keystone Avenue · Reno · Washoe County · Nevada · 89503
- Official metro area
- Reno, NV
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 12 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001605
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Cooling
- Closed-loop
- Community response
- Provider label: contested
- Announced
- 2024
Provider notes
Water. City of Reno's project FAQ describes rooftop chillers and a glycol-based cooling circuit (propylene glycol, with ethylene glycol in some designs), i.e. a recirculating circuit rejecting heat to air rather than an evaporative tower. TMRPA puts the site at roughly 0.29 acre-feet per MW; Nevada LCB puts expected use at approximately 651,000 gallons a year. A cooling-system change was reviewed at building-permit stage with TMWA confirming no significant increase in water demand.
Community. The City of Reno published a standing FAQ for this project specifically because of 'increased public inquiries', covering noise, construction hours, notification, generator emissions and power-demand growth. Conditions of approval require a 15-ft acoustically absorptive barrier around all rooftop chillers to hold equipment noise to ~43 dBA at the property line against a 53 dBA nighttime ambient.
What the source record says
CENTRA's own facility page advertises 4.4 MW available in Q4 2026, liquid-cooling-enabled to 150 kW per cabinet, air-cooled chillers and a target PUE of 1.35 or better. Capacity figures in circulation conflict (3 MW ramping to 6.67 MW as presented to the Planning Commission in January 2025, versus 12 MW advertised later), so no capacityMw value is asserted here. Site is split-zoned Industrial/General Commercial and not adjacent to residentially zoned land, which is why Reno's residential property-line noise standard does not apply.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-01-15 · source-reported permitted
Conditional use permit approved by the Reno Planning Commission; no appeals were filed.
- 2026-06 · source-reported under construction
Building permit issued after the 2025-09-11 geotechnical approval; more than 30 soils/compaction inspections during footing work, extended-hours concrete pours approved for May and June 2026, and the final setback/soil/compaction letter approved in June 2026.
Sources and attribution
- Keystone Data Center Frequently Asked Questions (updated 2026-07-28) · City of Reno
- CENTRA RNO2 — Reno, NV facility page · CENTRA Digital Interconnect
- Reno, Nevada data center directory (CENTRA Reno RNO2, 265 Keystone Ave) · goDataCenters
- Memo: Data Centers — Background Information (revised 2026-05-12) · Nevada Legislative Counsel Bureau, Research Division
- Centra completes structural topping out of Reno data center · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID centra-rno2-keystone-reno-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- Reno 2
- Operator’s facility code
- RNO2
- Address as published
- 265 Keystone Ave, Reno, NV 89503
Lifecycle status is not published for this listing.
Critical IT: 4.4 MW.
Cooling design reported by the operator: N+1 redundancy.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001605
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 265 Keystone Avenue, Reno, NV 89503 · Washoe (Approximate location)
Roles
- Operator: CENTRA Digital Interconnect
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2024
Provider-reported announcement date.
- Status history: 2025-01-15 · source-reported permitted
Status history supplied by the source.
- Status history: 2026-06 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 12 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.