Licensed lead · not independently verified · dcd-dir-002019

WhiteFiber NC-2 / NC-3 Data Center Campuses (Yadkinville)

source-reported proposed

WhiteFiber (Enovum Data Centers Corp.)

1032 Unifi Industrial Road · Yadkinville · Yadkin County · North Carolina

Reported planned 60 MWSource updated 15 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for WhiteFiber NC-2 / NC-3 Data Center Campuses (Yadkinville).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
WhiteFiber (Enovum Data Centers Corp.)
Address and locality
1032 Unifi Industrial Road · Yadkinville · Yadkin County · North Carolina
Official metro area
Winston-Salem, NC
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 60 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
15 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-002019

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
120 acres (source-reported; parcel boundary not established)
Announced
17 August 2026Provider-reported announcement date.

What the source record says

This is one composite record for two sites about 0.89 miles apart. The capacity and acreage figures are combined across both, and no per-site split is sourced. The 60 MW is the stated combined minimum initial gross utility capacity; the company says the sites could reach about 200 MW over time. The $60.0M is the land and building purchase price, not a build investment. The sites are inside Yadkinville town limits and already zoned for light industry, so the town says the county's two-year moratorium does not apply. Ready-for-service is targeted for Q3 2027. The street address is NC-2's, per Baxtel.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-08-17 · source-reported proposed

    WhiteFiber signed a definitive agreement to buy two Unifi industrial properties in Yadkin County for $60.0M and retrofit them as NC-2 and NC-3. Closing is expected in Q4 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID whitefiber-nc2-nc3-yadkinville-nc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-002019

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 1032 Unifi Industrial Road, Yadkinville, NC (Approximate location)

Roles

  • Operator: WhiteFiber (Enovum Data Centers Corp.)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 17 August 2026

    Provider-reported announcement date.

  • Status history: 2026-08-17 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 120 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 60 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-15

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →