Licensed lead · not independently verified · dcd-dir-002012

ValorC3 Boise 2

source-reported under construction

ValorC3 Data Centers

9601 W Emerald St · Boise · Ada County · Idaho · 83704

Reported planned 10 MWSource updated 4 October 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for ValorC3 Boise 2.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
ValorC3 Data Centers
Address and locality
9601 W Emerald St · Boise · Ada County · Idaho · 83704
Official metro area
Boise City, ID
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 10 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
4 October 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-002012

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Closed-loopProvider label.
Announced
5 May 2025Provider-reported announcement date.

Provider notes

Water. Designed with air and liquid cooling in a closed-loop cooling system to reduce water waste (Idaho Business Review; CommercialSearch).

What the source record says

A 38,000 sq ft building at 9601 W. Emerald St., next to Boise City Hall West. The City of Boise approved it, and it is valued at more than $20 million (BoiseDev, March 2026). investmentUsd is omitted because that figure is a permit valuation, not total capital cost. The first phase provides 10 MW of 'AI-ready colocation and connectivity'. A preliminary application seeks a further ~31,000 sq ft expansion, likely to start before phase one is finished. The pin was geocoded from the street address with the US Census geocoder, which interpolates along address ranges. aiClassification omitted: 'AI-ready' is marketing, not a stated AI workload.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-05-05 · source-reported proposed

    ValorC3 announced a second Boise data center, targeting completion in 2027.

    Open cited source →

  2. 2026-04-30 · source-reported under construction

    ValorC3 closed a credit facility with Apterra Infrastructure Capital to continue building the greenfield Boise facility. The project is backed by a long-term lease with a major hyperscale technology company.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID valorc3-boise-2-id. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-002012

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 9601 W Emerald St, Boise, ID 83704 · Ada (Approximate location)

Roles

  • Operator: ValorC3 Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 5 May 2025

    Provider-reported announcement date.

  • Status history: 2025-05-05 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-04-30 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 10 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-04

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →