This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Dahlgren West Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Oasis Digital Properties
- Address and locality
- Dahlgren · King George County · Virginia
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001930
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 485 acres (source-reported; parcel boundary not established)
- Announced jobs
- 1,500 construction
- Announced
- 15 April 2024
What the source record says
10 buildings totaling about 6.8M sq ft on the north side of James Madison Parkway. The developer projects 1,500 construction jobs and 50–60 permanent jobs per building. The site has access to 230 kV transmission. The coordinates are an approximate point on James Madison Parkway near Walnut Hill, not the parcel.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024-04-15 · source-reported proposed
Potomac Development Group proposed a ~500-acre, ~9M sq ft campus off U.S. 301.
- 2025-08 · source-reported permitted
King George Board of Supervisors unanimously approved Oasis's 485-acre, 10-building plan.
Sources and attribution
- NoVA-based data center company building new campus near Fredericksburg · Northern Virginia Magazine
- Developer Proposes 9M SF Data Center Campus In Virginia · Bisnow
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID oasis-dahlgren-west-king-george-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001930
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Dahlgren, VA · King George County (Approximate location)
Roles
- Operator: Oasis Digital Properties
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 15 April 2024
Provider-reported announcement date.
- Status history: 2024-04-15 · source-reported proposed
Status history supplied by the source.
- Status history: 2025-08 · source-reported permitted
Status history supplied by the source.
Area, acreage and buildings
- Land area: 485 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced jobs: 1,500 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.