This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for DigiPower X Hildebran Data Center (Cline Park Court).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- DigiPower X Inc. (formerly Digihost)
- Address and locality
- 199 Cline Park Court · Hildebran · Burke County · North Carolina
- Official metro area
- Hickory-Lenoir-Morganton, NC
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 15 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001826
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Duke Energy
- Power source
- Grid
- Land area
- 40.5 acres (source-reported; parcel boundary not established)
- Announced
- 23 February 2026
Provider notes
Energy. Baxtel lists the site as adjacent to a high-voltage Duke Energy substation; The Paper describes the newer parcel as near a major Duke Energy substation.
What the source record says
The 200 MW figure is the company's own statement as reported by WSOC; The Paper gives no site-specific MW. The parcels are 199 Cline Park Court (19.5 acres, bought 2022) and 0 U.S. 70 E. (21 acres, bought 2026), both registered to Digihost International, Inc. Town and county officials told The Paper the company had not contacted them about permits. The project began as a crypto-mining plan in 2022, and the town then adopted noise and power-use ordinances. Coordinates are an approximate town-level placement.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-02-23 · source-reported proposed
WSOC reports the company bought 21 more acres along US 70 in Hildebran and says the data center would be 200 MW.
Sources and attribution
- Data center company buys more land in Burke County · WSOC-TV
- DigiPower X quietly expands Hildebran land holdings amid unanswered data center plans · The Paper
- DigiPower X: Hildebran, NC · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID digipower-x-hildebran-burke-county-nc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001826
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 199 Cline Park Court, Hildebran, NC · Burke (Approximate location)
Roles
- Operator: DigiPower X Inc. (formerly Digihost)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 23 February 2026
Provider-reported announcement date.
- Status history: 2026-02-23 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 40.5 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Duke Energy
Utility as named by the provider.
- Power source: Grid
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-15
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.