Licensed lead · not independently verified · dcd-dir-001779

Middletown Technology Center (Cirrus Delaware LLC)

source-reported proposed

Cirrus Delaware, LLC

Middletown · New Castle County · Delaware

Reported planned 40 MWSource updated 1 October 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Middletown Technology Center (Cirrus Delaware LLC).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Cirrus Delaware, LLC
Address and locality
Middletown · New Castle County · Delaware
Official metro area
Philadelphia-Camden-Wilmington, PA-NJ-DE-MD
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 40 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
1 October 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001779

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
MixedProvider label.
On-site generation
52.5 MW (source-reported)On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Land area
70 acres (source-reported; parcel boundary not established)
Announced jobs
117 permanent · 750 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →

Provider notes

Energy. Per the applicant at the May 2016 IIC meeting, the facility would 'mostly pull power from the PJM grid from Middletown' over 138 kV lines from an adjacent substation. An on-site natural-gas cogeneration plant would supply redundancy and peak-period power within air-permit hour limits. DBT and Data Center Knowledge (2015) give the gas plant as 52.5 MW. At the 2016 IIC meeting the applicant described the data center as 40 MW, with 36 MW of white space at a design PUE of 1.4, for a 50 MW total requirement at full build.

What the source record says

Never built, and apparently dormant since the air-permit application was put on hold in October 2017. Status stays 'proposed' because no source records a formal withdrawal or cancellation. Treat the status as stalled, not active. The $7.5M state grant was conditional and reimbursement-only. No evidence was found that it was disbursed, so it is not recorded in subsidies. Sources disagree on cost: $250M (DCK 2015), about $400M (DBT 2015) and $350M (applicant, IIC 2016), so investmentUsd is unset. Jobs figures are the applicant's 2016 IIC projections. DBT 2015 cited 'more than 100' full-time and up to 2,000 construction jobs. Partners named at the IIC meeting were Duffield Associates (now Verdantas), MEP Associates and landowner Mautom, LLC. The end operator was never disclosed. The pin is Middletown's OSM boundary centroid, because the 70-acre Westown parcel did not resolve to a point.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2015 · source-reported proposed

    Middletown Town Council approved plans for the Middletown Technology Center: a 228,000 sq ft, 40 MW data center with a natural-gas cogeneration plant on 70 acres in the town's Westown area. DBT reports the approval came in August 2015. Data Center Knowledge's report is dated Aug 5, 2015.

    Open cited source →

  2. 2016-05-04 · source-reported proposed

    Delaware Infrastructure Investment Committee voted 4-0 to approve up to $7.5M in New Jobs Infrastructure Fund money for the project's utility infrastructure. The approval was conditioned on a DNREC air permit, financing disclosure, identification of the operator, and payment on a reimbursement basis.

    Open cited source →

  3. 2017-10 · source-reported proposed

    Per the dcmap.us activity log, Cirrus put its Middletown air-permit application on hold. No later activity was found.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID cirrus-delaware-middletown-technology-center-de. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001779

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Middletown, DE · New Castle (Approximate location)

Roles

  • Operator: Cirrus Delaware, LLC

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2015 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2016-05-04 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2017-10 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 70 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 40 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Mixed

    Provider label.

  • On-site generation: 52.5 MW (source-reported)

    On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Permits, incentives, jobs and proceedings

  • Announced jobs: 117 permanent · 750 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-01

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →