This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Nebo North Data Center Campus (Project Nebo).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- SetSquare Capital Group (Nebo North LLC)
- Address and locality
- Mona · Juab County · Utah
- Official metro area
- Provo-Orem-Lehi, UT
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Not established; source review excludes the published figure
- Source freshness
- 13 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001966
750 MW is a sought grid-supply figure and possible generation context, not shown as IT capacity. The upstream row remains attributed below, but this value is not repeated as site capacity.
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Rocky Mountain Power
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 361 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: opposed
- Announced
- 2 April 2026
Provider notes
Energy. Developers are seeking up to 750 MW from Rocky Mountain Power's grid through a Mona transmission line. The permit application says on-site natural gas generation could also be used, and Deseret News reports that a gas-powered plant is planned.
Water. Developers describe closed-loop cooling with trucked-in water. The water source is unclear (Salt Lake Tribune).
Community. More than 100 people opposed the project at the Sept. 8, 2026 Juab County Commission meeting, and residents formed Mona Cares: Neighbors for Responsible Development.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: Row context supports acreage and CUP history but not the new exact investment amount.
What the source record says
Up to 10 single-story buildings of about 300,000 sq ft each (about 3M sq ft) on about 361 acres of agricultural land off Goshen Road, near the town of Mona. The CUP covers Sections 13 and 14, T11S R1W. The coordinates are approximated from those PLSS sections and are not parcel-confirmed. SetSquare co-founder Jonathan Vanica is quoted by Deseret News.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-04-02 · source-reported proposed
Juab County posts a public hearing notice for the Nebo North LLC conditional use permit application for a data center campus
- 2026-04-15 · source-reported permitted
Juab County Planning Commission approves the conditional use permit after a roughly four-minute hearing
Sources and attribution
- A Utah county OK'd a data center campus the size of 20 Costcos. Neighbors say they were left 'in the dark.' · The Salt Lake Tribune
- Notice of Public Hearing: Nebo North LLC Conditional Use Permit · Juab County
- Mona citizens revolt against local data centers · Deseret News
- Mona residents against data center · ABC4
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID setsquare-nebo-north-mona-juab-county-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001966
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Mona, UT · Juab (Approximate location)
Roles
- Operator: SetSquare Capital Group (Nebo North LLC)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2 April 2026
Provider-reported announcement date.
- Status history: 2026-04-02 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-04-15 · source-reported permitted
Status history supplied by the source.
Area, acreage and buildings
- Land area: 361 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not established; source review excludes the published figure
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Rocky Mountain Power
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: opposed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-13
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.