Licensed lead · not independently verified · dcd-dir-001869

Merrimack Station Data Center (proposed, Bow)

source-reported proposed

Granite Shore Power (site owner; end developer not publicly identified)

97 River Rd · Bow · Merrimack County · New Hampshire · 03304

Capacity not established; source review excludes the published figureSource updated 8 October 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Merrimack Station Data Center (proposed, Bow).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Granite Shore Power (site owner; end developer not publicly identified)
Address and locality
97 River Rd · Bow · Merrimack County · New Hampshire · 03304
Official metro area
Outside an official metropolitan boundary
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
8 October 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001869
Capacity held out of the public projection.

350 MW is only a potential whole-site interconnection study, not an approved data-center capacity. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Eversource (Public Service Company of New Hampshire)Utility as named by the provider.
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Energy. The 350 MW figure is the load size in a Viability Assessment Agreement between PSNH (Eversource) and Granite Shore Power, LLC. Under it, PSNH studies a 'potential load interconnection of a 350 MW facility' to its transmission system, at the customer's sole cost. This is a study agreement, not an interconnection award. NH's Consumer Advocate separately said Eversource staff mentioned a developer considering 'up to 200 MW' in Bow.

Community. At a Bow Select Board meeting on 2026-09-23, an overwhelming majority of residents who spoke opposed the project, citing noise, water and air pollution. A rally against it was held on 2026-09-22. Governor Kelly Ayotte has said she opposes it and plans to propose a statewide data-center moratorium.

What the source record says

This is the former Merrimack Station coal plant site, which stopped coal generation in 2025; its two small kerosene combustion turbines are still listed as active. Granite Shore Power owns 343 acres there, in an industrial zone. That is the owner's site holding, not a confirmed data-center footprint, so landAcres is left blank. The FERC agreement says only 'a 350 MW facility' and never says data center. The data-center use comes from a Bow town official confirming high-level talks, as reported by NHPR and the Concord Monitor. The end developer has not been named and no application has been filed with the town, so confidence is 'reported'. Coordinates are the EIA plant point, so precision is approximate.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-04-23 · source-reported proposed

    PSNH filed a Viability Assessment Agreement (VSA-PSNH-001) with Granite Shore Power, LLC at FERC for a potential 350 MW load interconnection. A Bow town official later confirmed high-level talks about a data center at the site, but no application has been filed with the town.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID granite-shore-merrimack-station-bow-nh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001869

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 97 River Rd, Bow, NH 03304 · Merrimack (Approximate location)

Roles

  • Operator: Granite Shore Power (site owner; end developer not publicly identified)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-04-23 · source-reported proposed

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Eversource (Public Service Company of New Hampshire)

    Utility as named by the provider.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-08

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →