  "schema": "dcd-facility-classifications-1",
  "purpose": "Sourced facility classifications for reviewed records. Unknown is the default and is never stored: a record with no published assertion for a dimension is unknown for it. Each value quotes the source that states it for the exact scope shown. This file is not a census and supports no national classification percentage.",
  "as_of": "2026-09-24",
  "assertions": [
    {
      "assertion_id": "cls-sabey-intergate-quincy-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "sabey-intergate-quincy"
      },
      "dimension": "cooling",
      "value": "evaporative",
      "scope": "campus",
      "source": {
        "url": "https://ecology.wa.gov/getattachment/af601a75-5bd5-410c-8a47-dcef65b517ca/20260406SabeyInterNOCTSD.pdf",
        "title": "Approval Order No. 26AQ-E016 and Technical Support Document — Intergate Quincy – Sabey Data Center Properties",
        "publisher": "Washington State Department of Ecology, Eastern Region Air Quality Program",
        "source_date": "2026-04-06",
        "retrieved": "2026-09-24",
        "locator": "PDF p.22, Technical Support Document, Project Summary (TSD preparation date February 27, 2026); see also Approval Order p.8, Table 3: Cooling Units",
        "quote": "Intergate Quincy – Sabey Data Center Properties (the Permittee and source) is a data center classified as a Synthetic Minor 80 source with 96 previously permitted emergency generators and 280 previously permitted evaporative cooling emissions units.",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "The state air regulator's order covers 280 permitted evaporative cooling emissions units (Table 3 lists 148 Munters PV-W35-PVT and 132 Munters Oasis indirect evaporative units) that dissipate heat from electronic equipment at the 2200 M Street NE facility.",
      "does_not_establish": "That every building or data hall uses only evaporative cooling; that any unit is in service at a given date; water withdrawal or consumption; which tenant uses which hall.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-sabey-intergate-quincy-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "sabey-intergate-quincy"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "campus",
      "source": {
        "url": "https://ecology.wa.gov/getattachment/af601a75-5bd5-410c-8a47-dcef65b517ca/20260406SabeyInterNOCTSD.pdf",
        "title": "Approval Order No. 26AQ-E016 and Technical Support Document — Intergate Quincy – Sabey Data Center Properties",
        "publisher": "Washington State Department of Ecology, Eastern Region Air Quality Program",
        "source_date": "2026-04-06",
        "retrieved": "2026-09-24",
        "locator": "PDF p.3, Approval Order, Project Summary",
        "quote": "The list of equipment for this approval order includes 109 diesel engines used to power emergency electrical generators.",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "Permitted emergency diesel generation equipment exists in the approval order for this facility (up to 109 engines, 13 of them newly approved for Building E).",
      "does_not_establish": "That the site runs on these generators; generator run-hours; that all 109 engines are installed; the site's normal (utility) power supply or its supplier.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-vantage-quincy-campus-wa-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "vantage-quincy-campus-wa"
      },
      "dimension": "cooling",
      "value": "evaporative",
      "scope": "campus",
      "source": {
        "url": "https://ecology.wa.gov/20230829vantagenocpermit",
        "title": "Approval Order No. 23AQ-E056 — Vantage-Quincy Data Center",
        "publisher": "Washington State Department of Ecology, Eastern Region Air Quality Program",
        "source_date": "2023-08-29",
        "retrieved": "2026-09-24",
        "locator": "PDF p.5, Equipment section, paragraph after the engine table (resolves to ecology.wa.gov/getattachment/3496318c-…/20230829VantageNOCpermit.pdf)",
        "quote": "The Permittee will utilize indirect evaporative cooling units to dissipate heat from electronic equipment at the facility, thus eliminating evaporative cooling tower emissions from the project.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The 2023 approval order describes indirect evaporative cooling units as the heat-rejection method for electronic equipment at the three-phase 2101 M Street NE facility.",
      "does_not_establish": "That the phases built after 2023 were built as described; that no supplemental mechanical cooling exists; water use; current operating condition of any unit.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-vantage-quincy-campus-wa-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "vantage-quincy-campus-wa"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "campus",
      "source": {
        "url": "https://ecology.wa.gov/20230829vantagenocpermit",
        "title": "Approval Order No. 23AQ-E056 — Vantage-Quincy Data Center",
        "publisher": "Washington State Department of Ecology, Eastern Region Air Quality Program",
        "source_date": "2023-08-29",
        "retrieved": "2026-09-24",
        "locator": "PDF p.3, Equipment section",
        "quote": "The list of equipment that was evaluated for this order of approval consists of five existing MTU Model 20V4000 diesel engines used to power emergency electrical generators",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "Diesel emergency generators exist/are permitted at the facility (five existing at order date; 61 engine-generators across three phases).",
      "does_not_establish": "That the site operates on generator power; run-hours; that phases two and three were installed; normal power supply.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-cyrusone-quincy-data-center-wa-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "cyrusone-quincy-data-center-wa"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "building",
      "source": {
        "url": "https://ecology.wa.gov/20260122cyrusonenoctsd",
        "title": "Approval Order No. 26AQ-E008 and Technical Support Document — CyrusOne LLC – Quincy Data Center (PNW1)",
        "publisher": "Washington State Department of Ecology, Eastern Region Air Quality Program",
        "source_date": "2026-01-22",
        "retrieved": "2026-09-24",
        "locator": "PDF p.5, Approval Conditions, 2. Operating Limitations, condition a (diesel fuel limit for the 22 engines); backup purpose at Approval Conditions 1.a, PDF p.4 ('Each engine approved in this Order must operate as an emergency engine as defined at 40 C.F.R. 60, Subpart IIII') and Project Summary, PDF p.3 ('reducing the facility total emergency generators from 42 to a total of 22') (resolves to ecology.wa.gov/getattachment/59e53690-…/20260122CyrusOneNOCTSD.pdf)",
        "quote": "The fuel consumption at the CyrusOne Data Center facility after full build-out and commissioning (a total of 22 engines) must be limited to a total of 132,016 gallons per year of diesel fuel",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "The facility at 1025 D Street NW holds an approval for up to 22 diesel-fuelled engines (reduced from 42) that the same order requires to operate as emergency engines.",
      "does_not_establish": "That the facility operates on generator power; run-hours; normal power supply or supplier; whether all 22 engines are installed today.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-h5-quincy-data-center-wa-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "h5-quincy-data-center-wa"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "building",
      "source": {
        "url": "https://ecology.wa.gov/20241126h5nocpermit",
        "title": "Approval Order No. 24AQ-E040 — H5 Data Centers – Quincy",
        "publisher": "Washington State Department of Ecology, Eastern Region Air Quality Program",
        "source_date": "2024-11-26",
        "retrieved": "2026-09-24",
        "locator": "PDF p.5, Approval Conditions, 2. Operating Limitations, condition a; TSD p.19 identifies the fuel as diesel (resolves to ecology.wa.gov/getattachment/05f07ceb-…/20241126H5NOCpermit.pdf)",
        "quote": "The fuel consumption by all the engines that power the emergency backup generators will be limited to 421,612 gallons per year and 28,151 gallons per day of specification No. 2 distillate fuel oil (less than 0.00150 weight percent sulfur).",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "Emergency backup generators burning No. 2 distillate (diesel) fuel are approved at 1711 M Street NE.",
      "does_not_establish": "That the facility runs on them; run-hours; the normal power supply or its supplier.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-willow-creek-ginger-east-west-des-moines-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "willow-creek-ginger-east-west-des-moines"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "campus",
      "source": {
        "url": "https://www.iowadnr.gov/media/7168/download?inline",
        "title": "Title V Operating Permit 24-TV-005 — Willow Creek / Ginger East Data Centers",
        "publisher": "Iowa Department of Natural Resources",
        "source_date": "2024-12-09",
        "retrieved": "2026-09-24",
        "locator": "PDF p.18, Plant-wide conditions, PM2.5 high-activity-day fuel limits (a); same page limits each engine to operate as an emergency stationary internal combustion engine; equipment list p.4",
        "quote": "Generator Engines EU-1 through EU-86 are limited to burning a maximum of 265,723 gallons of diesel fuel",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "The permit-defined two-address group holds diesel-fuelled generator engines that the same permit restricts to emergency stationary engine operation.",
      "does_not_establish": "That the site runs on generator power; actual engine-hours; normal power supply or supplier; the permit also allows approved HVO fuel, so the exact fuel in use at any time is not established.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-osmium-data-center-west-des-moines-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "osmium-data-center-west-des-moines"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "building",
      "source": {
        "url": "https://www.iowadnr.gov/media/6245/download?inline",
        "title": "Title V Operating Permit 24-TV-004 — Osmium Data Center",
        "publisher": "Iowa Department of Natural Resources",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "PDF p.4, I. Facility Description and Equipment List, emission units EU-1 onward",
        "quote": "EP-1 EU-1 Emergency Diesel Generator Engine 19-A-469-S3",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "The Title V permit for 5855 SW Kerry St lists emergency diesel generator engines as emission units.",
      "does_not_establish": "That the site runs on generator power; run-hours; normal power supply or supplier; any cooling or operating-model value.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-colovore-meridian-parkway-aurora-il-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "colovore-meridian-parkway-aurora-il"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "project",
      "source": {
        "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Colovore%20LLC%20043407AEM%20Joing%20Construction%20LOP%2025070018.pdf",
        "title": "Environmental Justice notification letter — Colovore LLC (BOA ID 043407AEM), Joint Construction and Lifetime Operating Permit Application 25070018",
        "publisher": "Illinois Environmental Protection Agency, Office of Environmental Justice",
        "source_date": "2025-08-14",
        "retrieved": "2026-09-24",
        "locator": "Letter p.1, first paragraph",
        "quote": "Colovore LLC located in Aurora at 4245 Meridian Parkway is applying for a Joint Construction and Lifetime Operating Permit for a new data center consisting of ﬁve 2MW diesel powered emergency generators.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The permit application for the proposed Aurora data center covers five diesel-powered emergency generators.",
      "does_not_establish": "Permit issuance; installation; that the site will run on generators; normal power supply or supplier.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-goodman-energy-park-data-center-vernon-ca-power_counterparty-1",
      "subject": {
        "kind": "record",
        "stable_id": "goodman-energy-park-data-center-vernon-ca"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "Vernon Public Utility (VPU)",
        "role": "serving_utility",
        "agreement_status": "planned"
      },
      "scope": "campus",
      "source": {
        "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf",
        "title": "Vernon Backup Generating Facility (VBGF) — project page, Docket 25-SPPE-01",
        "publisher": "California Energy Commission",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Project Description, second paragraph",
        "quote": "The VBGF would not be electrically interconnected to the electrical transmission grid. The GEP would be supplied electricity by VPU through a new switching station on the GEP site that would be owned and operated by VPU (VPU Switching Station).",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The state siting agency's project description names the municipal utility VPU as the planned electricity supplier to the two-building Goodman Energy Park data center.",
      "does_not_establish": "An executed service agreement; contracted or delivered MW; that the project is approved or built (SPPE status: Under Review).",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-goodman-energy-park-data-center-vernon-ca-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "goodman-energy-park-data-center-vernon-ca"
      },
      "dimension": "power_source",
      "value": "grid_utility_service",
      "scope": "campus",
      "source": {
        "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf",
        "title": "Vernon Backup Generating Facility (VBGF) — project page, Docket 25-SPPE-01",
        "publisher": "California Energy Commission",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Project Description, second paragraph",
        "quote": "The GEP would be supplied electricity by VPU through a new switching station on the GEP site that would be owned and operated by VPU (VPU Switching Station).",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The planned normal power supply for the campus is utility service from VPU.",
      "does_not_establish": "Energization; service capacity; generation mix of the utility supply.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-goodman-energy-park-data-center-vernon-ca-power_source-2",
      "subject": {
        "kind": "record",
        "stable_id": "goodman-energy-park-data-center-vernon-ca"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "campus",
      "source": {
        "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf",
        "title": "Vernon Backup Generating Facility (VBGF) — project page, Docket 25-SPPE-01",
        "publisher": "California Energy Commission",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Project Description, first paragraph",
        "quote": "The Vernon Backup Generating Facility (VBGF) would consist of a total of forty (40) diesel fired generators that would be used exclusively to provide up to 99 megawatts (MW) of backup emergency generation to support the Goodman Energy Park Data Center (GEP)",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The proposed backup system for the campus is diesel-fired emergency generation.",
      "does_not_establish": "Exemption approval, installation or operation; that the campus runs on diesel.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-northtown-data-center-san-jose-ca-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "northtown-data-center-san-jose-ca"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "campus",
      "source": {
        "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility",
        "title": "NorthTown Backup Generating Facility — project page, Docket 25-SPPE-02",
        "publisher": "California Energy Commission",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Project Description, first paragraph",
        "quote": "The NorthTown Backup Generating Facility (NTBGF) would consist of a total of forty two (42) diesel- fired generators that would be used exclusively to provide up to 97.3 megawatts (MW) of backup emergency generation to support NorthTown Data Center (NTDC)",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The proposed backup system for the NorthTown campus is diesel-fired emergency generation.",
      "does_not_establish": "Exemption approval, installation or operation; normal power supplier; that the campus runs on diesel.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-mclaren-data-center-santa-clara-ca-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "mclaren-data-center-santa-clara-ca"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "project",
      "source": {
        "url": "https://ceqanet.lci.ca.gov/2018062057/6",
        "title": "Vantage Data Centers- Mclaren Data Center Project — Issuance of ATC-AN-32087 (Notice of Determination, SCH 2018062057)",
        "publisher": "Governor's Office of Land Use and Climate Innovation, State Clearinghouse (CEQAnet)",
        "source_date": "2024-08-21",
        "retrieved": "2026-09-24",
        "locator": "Document Description",
        "quote": "The Bay Area Air Quality Management District (Air District) has issued an Authority to Construct for the Mclaren Backup Generating Facility (MBGF) for four additional backup diesel generators. The MBGF provides emergency backup power for the Mclaren Data Center (MDC).",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "An issued Authority to Construct covers backup diesel generators providing emergency power to the McLaren Data Center, in addition to previously authorized backup diesel engines.",
      "does_not_establish": "That the four added units are installed; run-hours; normal power supply or supplier.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-stack-svy03a-hayward-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "stack-svy03a-hayward"
      },
      "dimension": "power_source",
      "value": "grid_utility_service",
      "scope": "campus",
      "source": {
        "url": "https://ceqanet.lci.ca.gov/2025030999",
        "title": "SVY03A Data Center Campus — CEQAnet SCH 2025030999",
        "publisher": "Governor's Office of Land Use and Climate Innovation, State Clearinghouse (CEQAnet)",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Document Description",
        "quote": "The backup generators would be run for short periods for testing and maintenance purposes and otherwise would not operate unless there is a disturbance or interruption of the utility supply.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The environmental filing describes utility supply as the campus's normal power source, with generators as backup only.",
      "does_not_establish": "Which entity supplies energy (PG&E delivery vs. Ava Community Energy generation is unresolved); service capacity; energization.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-meta-richland-parish-power_counterparty-1",
      "subject": {
        "kind": "record",
        "stable_id": "meta-richland-parish"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "Entergy Louisiana, LLC",
        "role": "serving_utility",
        "agreement_status": "executed"
      },
      "scope": "campus",
      "source": {
        "url": "https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=nDWn/juc2+A%3D",
        "title": "Order No. U-37425 — Entergy Louisiana, LLC, ex parte (generation and transmission resources for a single customer project in North Louisiana)",
        "publisher": "Louisiana Public Service Commission",
        "source_date": "2025-08-20",
        "retrieved": "2026-09-24",
        "locator": "PDF p.1, I. Overview and Procedural History, first paragraph (decided at the August 20, 2025 B&E Session); ESA submitted with the Application at PDF p.2; Exhibit A settlement ¶2 (PDF p.10) and Customer Protection Conditions ¶¶1–2 (PDF p.22): ESA 'entered into with the Customer', approval of the ESA expressly not sought or given",
        "quote": "the Company to construct the generation and transmission resources needed to serve significant new load associated with a data center being developed by Meta Platforms, Inc., through its subsidiary, Laidley LLC (the “Customer”), in Richland Parish, Louisiana",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "Entergy Louisiana is the utility that applied for, and the Commission ruled on, resources to serve the Meta/Laidley data center load; the order also records an Electric Service Agreement between ELL and the Customer (p.2).",
      "does_not_establish": "Commission approval of the ESA terms themselves (the settlement says nothing in it or in the certification \"should be construed as approval of the ESA and the Related Agreements\"); MW actually delivered; energization date; any on-site generation.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-meta-richland-parish-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "meta-richland-parish"
      },
      "dimension": "power_source",
      "value": "grid_utility_service",
      "scope": "campus",
      "source": {
        "url": "https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=nDWn/juc2+A%3D",
        "title": "Order No. U-37425 — Entergy Louisiana, LLC, ex parte",
        "publisher": "Louisiana Public Service Commission",
        "source_date": "2025-08-20",
        "retrieved": "2026-09-24",
        "locator": "PDF p.1, I. Overview and Procedural History",
        "quote": "approval by the Commission for the Company to construct the generation and transmission resources needed to serve significant new load associated with a data center",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The data center's load is to be served as a utility customer of ELL through utility-built generation and transmission.",
      "does_not_establish": "That no on-site generation exists; energization; delivered load; the fuel mix of the utility resources.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-google-fort-wayne-power_counterparty-1",
      "subject": {
        "kind": "record",
        "stable_id": "google-fort-wayne"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "Indiana Michigan Power Company",
        "role": "serving_utility",
        "agreement_status": "executed"
      },
      "scope": "campus",
      "source": {
        "url": "https://www.in.gov/iurc/files/ord_46276_042926.pdf",
        "title": "Order of the Commission, Cause No. 46276 (Indiana Michigan Power Company customer-specific Clean Capacity Arrangement and demand response contract)",
        "publisher": "Indiana Utility Regulatory Commission",
        "source_date": "2026-04-29",
        "retrieved": "2026-09-24",
        "locator": "PDF p.2, Findings ¶2 'Petitioner’s and Google’s Characteristics'",
        "quote": "I&M energized Google’s site in November, 2024; Google has begun operation and continues to develop its Fort Wayne site consistent with its contractual agreements with I&M.",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "I&M is the electric utility that energized (November 2024) and serves Google's Fort Wayne site under contractual agreements with I&M; p.3 records that Google continues taking service under I&M’s Tariff I.P.",
      "does_not_establish": "Contract capacity or MW drawn; that the Contract approved in this order is a supply contract (it is a capacity-transfer and demand-response contract, so the approval does not attach to the serving-utility relationship); on-site generation.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-google-fort-wayne-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "google-fort-wayne"
      },
      "dimension": "power_source",
      "value": "grid_utility_service",
      "scope": "campus",
      "source": {
        "url": "https://www.in.gov/iurc/files/ord_46276_042926.pdf",
        "title": "Order of the Commission, Cause No. 46276",
        "publisher": "Indiana Utility Regulatory Commission",
        "source_date": "2026-04-29",
        "retrieved": "2026-09-24",
        "locator": "PDF p.3, Findings ¶4 Petitioner’s Evidence",
        "quote": "He stated that the Contract requires Commission approval and that Google will continue taking service under I&M’s Tariff I.P. and applicable terms and conditions.",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "The site takes retail utility service from I&M under an industrial tariff.",
      "does_not_establish": "Service capacity; delivered energy; absence of on-site generation.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-amazon-nipsco-northern-indiana-service-power_counterparty-1",
      "subject": {
        "kind": "record",
        "stable_id": "amazon-nipsco-northern-indiana-service"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "Northern Indiana Public Service Company LLC",
        "role": "special_contract_utility",
        "agreement_status": "approved"
      },
      "scope": "project",
      "source": {
        "url": "https://secure.in.gov/iurc/files/ord_46322_061726.pdf",
        "title": "Order of the Commission, Cause No. 46322 (NIPSCO and NIPSCO Generation LLC — Data Center Customer #1 Special Contract)",
        "publisher": "Indiana Utility Regulatory Commission",
        "source_date": "2026-06-17",
        "retrieved": "2026-09-24",
        "locator": "PDF p.3, ¶3 (supply statement); ordering paragraph 2, PDF p.41 ('The Customer Contract is approved.')",
        "quote": "NIPSCO is seeking to supply retail service to Amazon Data Services, Inc. (“Amazon”). Amazon is in the business of data center development in northern Indiana, with operations expected to begin by January 1, 2027",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "NIPSCO is the utility party to the Commission-approved special contract to supply retail electric service to Amazon Data Services for northern-Indiana data-center load.",
      "does_not_establish": "Which specific data-center sites are served (Exhibit A-2 locations are confidential); MW actually drawn; that the 2,400 MW ramp occurs.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-project-cannoli-van-buren-township-power_counterparty-1",
      "subject": {
        "kind": "record",
        "stable_id": "project-cannoli-van-buren-township"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "DTE Electric Company",
        "role": "special_contract_utility",
        "agreement_status": "applied"
      },
      "scope": "project",
      "source": {
        "url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001pUwYcAAK",
        "title": "Qualifications and Public Direct Testimony of Neal T. Foley, DTE Electric Company, MPSC Case No. U-22058",
        "publisher": "Michigan Public Service Commission e-docket (filing by DTE Electric Company)",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Testimony p.NTF-3 (PDF p.4), Q6/A6, line 6 (contracts listed at lines 8–9: Primary Supply Agreement, Clean Capacity Accelerator Agreement); site at NTF-8 Q16/A16 (PDF p.10): 'The data center will be located in Van Buren Township, Michigan, within the Company’s service territory. It will be developed on roughly 280 acres.'; project name tie at Beynard testimony SNB-5 (PDF p.157): ITC's transmission project 'is outlined in MISO Expedited Review Request Cannoli 1'",
        "quote": "contracts that have been executed between the Company and Google LLC",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "DTE Electric has executed special contracts (Primary Supply Agreement and Clean Capacity Accelerator Agreement) with Google LLC to serve a planned 1,000 MW-max data-center load in Van Buren Township on roughly 280 acres, submitted to the MPSC for approval in Case U-22058; the same filing ties the associated ITC transmission project to MISO Expedited Review Request \"Cannoli 1\".",
      "does_not_establish": "Commission approval (this is the utility's testimony, not an order); that this Google customer is the same entity as the record's developer PDC VBT, LLC; MW drawn; construction.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-amazon-scioto-darby-hilliard-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "amazon-scioto-darby-hilliard"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "campus",
      "source": {
        "url": "https://hilliardohio.gov/wp-content/uploads/2025/10/OPSB-Report-Certificate-and-Conditions.pdf",
        "title": "Staff Report of Investigation, Case No. 25-0649-EL-BLN — Scioto Darby Creek Road Fuel Cell System Electric Generation Project (Ohio Power Company)",
        "publisher": "Ohio Power Siting Board staff (copy hosted by the City of Hilliard)",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Staff Report p.1–2, Project Description (PDF pp.4–5): campus location ('Amazon owns a 142-acre industrial property campus where the 6.4-acre project would be located'), BTM/parallel operation; fuel at 'Fuel Cell Based Electric Generation Technology' (PDF p.5): 'electrochemical reaction, not combustion, of natural gas with steam and air'; staff recommended automatic approval September 22, 2025 (PDF p.1)",
        "quote": "This facility would be operated in behind the meter (BTM) mode where its electric output is dedicated to a single customer’s electric load. The fuel cell project would run in parallel with the grid but would not back feed its power to the grid.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "A nominal 72.9 MW natural-gas solid oxide fuel cell plant was proposed on the Amazon campus at 4186 Scioto Darby Creek Road to run behind the meter, in parallel with the grid, dedicated to that customer's load and offsetting a portion of its electricity needs.",
      "does_not_establish": "Issuance of the OPSB certificate (this document is the staff report recommending automatic approval on September 22, 2025); that the fuel cells are installed or operating (the city appealed the Ohio EPA air permit, later ending the appeal); share of load served; that the campus is off-grid; that the generation is primary or backup (the report states neither word).",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "unstated",
        "fuel": "fuel_cell_natural_gas",
        "behind_the_meter": true
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-amazon-scioto-darby-hilliard-power_source-2",
      "subject": {
        "kind": "record",
        "stable_id": "amazon-scioto-darby-hilliard"
      },
      "dimension": "power_source",
      "value": "grid_utility_service",
      "scope": "campus",
      "source": {
        "url": "https://hilliardohio.gov/wp-content/uploads/2025/10/OPSB-Report-Certificate-and-Conditions.pdf",
        "title": "Staff Report of Investigation, Case No. 25-0649-EL-BLN",
        "publisher": "Ohio Power Siting Board staff (copy hosted by the City of Hilliard)",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Staff Report p.1, Project Description",
        "quote": "The customer currently has an electric load of 328 MW that would be supplied by the Applicant and its affiliates.",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "The campus takes utility service from Ohio Power Company (AEP) and affiliates; the fuel cells only offset a portion of load.",
      "does_not_establish": "The 328 MW figure as metered consumption; future load; generation mix.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-amazon-scioto-darby-hilliard-power_counterparty-1",
      "subject": {
        "kind": "record",
        "stable_id": "amazon-scioto-darby-hilliard"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "Ohio Power Company",
        "role": "serving_utility",
        "agreement_status": "executed"
      },
      "scope": "campus",
      "source": {
        "url": "https://hilliardohio.gov/wp-content/uploads/2025/10/OPSB-Report-Certificate-and-Conditions.pdf",
        "title": "Staff Report of Investigation, Case No. 25-0649-EL-BLN",
        "publisher": "Ohio Power Siting Board staff (copy hosted by the City of Hilliard)",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Staff Report p.1, Project Description",
        "quote": "Amazon Data Services, Inc. (“Amazon” or “customer”) is a retail customer of the Applicant.",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "Ohio Power Company (an AEP subsidiary) is the retail electric utility for the Amazon Scioto Darby campus.",
      "does_not_establish": "Contract terms; MW drawn.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-amazon-scioto-darby-hilliard-power_counterparty-2",
      "subject": {
        "kind": "record",
        "stable_id": "amazon-scioto-darby-hilliard"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "Ohio Power Company",
        "role": "onsite_generation_owner",
        "agreement_status": "executed"
      },
      "scope": "campus",
      "source": {
        "url": "https://hilliardohio.gov/wp-content/uploads/2025/10/OPSB-Report-Certificate-and-Conditions.pdf",
        "title": "Staff Report of Investigation, Case No. 25-0649-EL-BLN",
        "publisher": "Ohio Power Siting Board staff (copy hosted by the City of Hilliard)",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Staff Report p.2, Project Description (PDF p.5); 'The Applicant would own all equipment.' in the same paragraph",
        "quote": "The customer and the Applicant have recently entered an agreement for the Applicant to procure, install, maintain, and operate this electric generation project on the customer’s campus to offset a portion of the customer’s electricity needs.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "Ohio Power Company has entered an agreement with Amazon under which Ohio Power would own, procure, install, maintain and operate the on-campus fuel cell generation.",
      "does_not_establish": "Issuance of the OPSB certificate; that equipment is installed; Bloom Energy's role beyond design and installation; operation; the agreement's terms.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-brookfield-paducah-site-ai-campus-ky-workload-1",
      "subject": {
        "kind": "record",
        "stable_id": "brookfield-paducah-site-ai-campus-ky"
      },
      "dimension": "workload",
      "value": "ai_hpc",
      "scope": "campus",
      "source": {
        "url": "https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power",
        "title": "Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky",
        "publisher": "U.S. Department of Energy",
        "source_date": "2026-07-29",
        "retrieved": "2026-09-24",
        "locator": "Article body, third paragraph ('At or near the Paducah campus…')",
        "quote": "NextEra Energy plans to develop 2 gigawatts (GW) of new grid-connected natural gas-fired generation, upgrade existing transmission infrastructure, and deploy up to 2.6 GW of battery energy storage to support a new 1.8 GW artificial intelligence and high-performance computing (HPC) innovation campus.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The federal site owner describes the planned Paducah campus as an artificial-intelligence and high-performance-computing campus.",
      "does_not_establish": "That any AI/HPC workload runs today (construction expected to complete 2031); tenants; that the 1.8 GW design is built.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-brookfield-paducah-site-ai-campus-ky-power_counterparty-1",
      "subject": {
        "kind": "record",
        "stable_id": "brookfield-paducah-site-ai-campus-ky"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "Jackson Purchase Energy Cooperative",
        "role": "serving_utility",
        "agreement_status": "planned"
      },
      "scope": "campus",
      "source": {
        "url": "https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power",
        "title": "Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky",
        "publisher": "U.S. Department of Energy",
        "source_date": "2026-07-29",
        "retrieved": "2026-09-24",
        "locator": "Article body, paragraph beginning 'in November 2025, Brookfield was selected'",
        "quote": "Big Rivers Electric Power Corporation will provide wholesale electric service, Jackson Purchase Energy Cooperative will provide retail electric service, and Paducah Power System will serve as a community partner.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The announced planned retail electric provider for the campus is Jackson Purchase Energy Cooperative (with Big Rivers as its wholesale supplier).",
      "does_not_establish": "Kentucky PSC approval (the next sentence says the power service agreement remains subject to approval by the Kentucky Public Service Commission); contracted or delivered MW; energization.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-brookfield-paducah-site-ai-campus-ky-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "brookfield-paducah-site-ai-campus-ky"
      },
      "dimension": "power_source",
      "value": "grid_utility_service",
      "scope": "campus",
      "source": {
        "url": "https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power",
        "title": "Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky",
        "publisher": "U.S. Department of Energy",
        "source_date": "2026-07-29",
        "retrieved": "2026-09-24",
        "locator": "Article body, paragraph beginning 'in November 2025, Brookfield was selected'",
        "quote": "Jackson Purchase Energy Cooperative will provide retail electric service",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The planned power arrangement includes retail utility service to the campus.",
      "does_not_establish": "Whether the NextEra gas and battery resources are on the campus or behind the meter ('at or near', 'grid-connected'); approval; energization.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-project-baccara-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "project-baccara"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "project",
      "source": {
        "url": "https://www.azcc.gov/news/home/2026/02/06/february-4--2026-open-meeting-highlights",
        "title": "February 4, 2026 Open Meeting Highlights",
        "publisher": "Arizona Corporation Commission",
        "source_date": "2026-02-06",
        "retrieved": "2026-09-24",
        "locator": "Utilities section, item 'Baccara Power, LLC' (L-21369A-25-0222-00253)",
        "quote": "Takanock, LLC is proposing to build a new data center with on-site natural gas generators, called Project Baccara, in the West Valley area of Maricopa County.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The project design includes on-site natural gas generation (about 700 MW) for which the Commission approved a Certificate of Environmental Compatibility to Baccara Power, LLC.",
      "does_not_establish": "Construction or operation; county and Luke AFB approvals (pending); the share of output used on site vs exported; data-center approval (the ACC says it does not approve the data center).",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "unstated",
        "fuel": "natural_gas"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-mghpcc-holyoke-ma-operating_model-1",
      "subject": {
        "kind": "record",
        "stable_id": "mghpcc-holyoke-ma"
      },
      "dimension": "operating_model",
      "value": "research_hpc",
      "scope": "building",
      "source": {
        "url": "https://archives.lib.state.ma.us/bitstreams/aadd15a4-d44c-4840-ab62-0c5760e12763/download",
        "title": "Governor Healey Announces Massachusetts AI Hub to Make State Global Leader in Applied AI Innovation (press release)",
        "publisher": "Office of Governor Maura Healey (Massachusetts State Library archive copy)",
        "source_date": "2024-12-19",
        "retrieved": "2026-09-24",
        "locator": "PDF p.4, boilerplate 'Massachusetts Green High Performance Computing Center:' (served from archives.lib.state.ma.us/server/api/core/bitstreams/…/content)",
        "quote": "The Massachusetts Green High Performance Computing Center (MGHPCC) in Holyoke is a joint venture of Boston University, Harvard, MIT, Northeastern, the University of Massachusetts system and Yale, serving more than 20,000 faculty and student researchers and educators.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The facility is a university research computing center run as a joint venture of research universities for their researchers; the same page calls it 'the first university research data center' to reach LEED Platinum.",
      "does_not_establish": "Current (2026) membership or governance; whether any commercial tenants exist; building ownership (assessor owner label is separate).",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-mghpcc-holyoke-ma-workload-1",
      "subject": {
        "kind": "record",
        "stable_id": "mghpcc-holyoke-ma"
      },
      "dimension": "workload",
      "value": "ai_hpc",
      "scope": "building",
      "source": {
        "url": "https://archives.lib.state.ma.us/bitstreams/aadd15a4-d44c-4840-ab62-0c5760e12763/download",
        "title": "Governor Healey Announces Massachusetts AI Hub to Make State Global Leader in Applied AI Innovation (press release)",
        "publisher": "Office of Governor Maura Healey (Massachusetts State Library archive copy)",
        "source_date": "2024-12-19",
        "retrieved": "2026-09-24",
        "locator": "PDF p.1, fourth paragraph; PDF line-break hyphen in 'high-performance' joined",
        "quote": "unveiled a partnership with the nonprofit Massachusetts Green High Performance Computer Center (MGHPCC) in Holyoke to expand access to sustainable high-performance computing that is necessary for AI innovation.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The state describes the facility's function as providing high-performance computing, which it is expanding for AI work.",
      "does_not_establish": "That the facility is exclusively AI/HPC (it also hosts general research IT); the facility name itself is not relied on; current utilization.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-indiana-iot-operating_model-1",
      "subject": {
        "kind": "record",
        "stable_id": "indiana-iot"
      },
      "dimension": "operating_model",
      "value": "government",
      "scope": "building",
      "source": {
        "url": "https://www.in.gov/iot/files/Aug2026_IOT%20Services%20Catalog%20FY27_81226.pdf",
        "title": "Fiscal Year 2027 IOT Product & Services Catalog",
        "publisher": "Indiana Office of Technology",
        "source_date": "2026-08-12",
        "retrieved": "2026-09-24",
        "locator": "PDF p.133, Appendix B - IOT Data Center, second paragraph",
        "quote": "Housed within the IOT data center are two mainframes supporting Indiana State Government, the City of Indianapolis and Ball State University.",
        "evidence_class": "primary_official"
      },
      "confidence": "high",
      "establishes": "The state IT agency runs this data center for state government and other public bodies (see also p.87: 'All information systems in the State of Indiana data centers are maintained by IOT').",
      "does_not_establish": "Building address or ownership; the separate secondary/DR data center; capacity.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-indiana-iot-workload-1",
      "subject": {
        "kind": "record",
        "stable_id": "indiana-iot"
      },
      "dimension": "workload",
      "value": "general_purpose",
      "scope": "building",
      "source": {
        "url": "https://www.in.gov/iot/files/Aug2026_IOT%20Services%20Catalog%20FY27_81226.pdf",
        "title": "Fiscal Year 2027 IOT Product & Services Catalog",
        "publisher": "Indiana Office of Technology",
        "source_date": "2026-08-12",
        "retrieved": "2026-09-24",
        "locator": "PDF p.133, Appendix B - IOT Data Center, second paragraph",
        "quote": "More than 4,000 Windows/UNIX/AIX virtual and physical servers support hundreds of applications and 4,000 databases for 28,000 state employees.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The data center's stated workload is enterprise government IT (applications, databases, mainframes, virtual servers) for state employees.",
      "does_not_establish": "Absence of any HPC or AI system; utilization; the date the counts were measured.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-velco-new-haven-operations-facility-vt-operating_model-1",
      "subject": {
        "kind": "record",
        "stable_id": "velco-new-haven-operations-facility-vt"
      },
      "dimension": "operating_model",
      "value": "self_operated",
      "scope": "building",
      "source": {
        "url": "https://www.velco.com/projects/new-haven-operations-facility",
        "title": "New Haven Operations Facility — project page",
        "publisher": "Vermont Electric Power Company (VELCO)",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Project page, introductory paragraph and component list ('Backup operations center', 'Data center')",
        "quote": "The New Haven Operations Facility will enable the VELCO Operations, Information Technologies, Energy Management System and Data and Communications facilities to continue the safe and reliable operation of the electric grid during an emergency.",
        "evidence_class": "first_party_operator"
      },
      "confidence": "moderate",
      "establishes": "The data center in this building is the utility's own backup IT/operations facility, not space offered to others.",
      "does_not_establish": "Completion or current operation; capacity; the building's power supply.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "self_operated_scope": "own_enterprise_it"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-meta-lebanon-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "meta-lebanon"
      },
      "dimension": "cooling",
      "value": "closed_loop",
      "scope": "campus",
      "source": {
        "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
        "title": "Meta’s New Data Center in Lebanon, Indiana Marks Milestone AI Investment",
        "publisher": "Meta (Meta Newsroom)",
        "source_date": "2026-02-11",
        "retrieved": "2026-09-24",
        "locator": "Article body, sustainability paragraph",
        "quote": "The data center will use a water-efficient closed-loop, liquid-cooled system that recirculates the same water and will use zero water for a majority of the year.",
        "evidence_class": "first_party_operator"
      },
      "confidence": "moderate",
      "establishes": "Meta's stated design for the Lebanon campus is a closed-loop liquid cooling system.",
      "does_not_establish": "As-built or operating cooling (the campus is under construction); whether cooling is chip-level; water use; the 'zero water' claim.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-microsoft-la-porte-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "microsoft-la-porte"
      },
      "dimension": "cooling",
      "value": "closed_loop",
      "scope": "campus",
      "source": {
        "url": "https://local.microsoft.com/blog/microsoft-breaks-ground-on-la-porte-datacenter-project/",
        "title": "Microsoft breaks ground on La Porte datacenter project",
        "publisher": "Microsoft (Microsoft Local)",
        "source_date": "2025-10-15",
        "retrieved": "2026-09-24",
        "locator": "Blog post body, paragraph after the Datacenter Academy quote",
        "quote": "The campus will be designed with the latest energy efficient and closed-loop liquid cooling technologies to conserve natural resources.",
        "evidence_class": "first_party_operator"
      },
      "confidence": "moderate",
      "establishes": "Microsoft's stated design for the La Porte campus uses closed-loop liquid cooling.",
      "does_not_establish": "As-built or operating cooling; chip-level vs facility loop; water use.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-qts-van-wert-oh-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "qts-van-wert-oh"
      },
      "dimension": "cooling",
      "value": "closed_loop",
      "scope": "campus",
      "source": {
        "url": "https://q.com/data-centers/van-wert/",
        "title": "QTS Van Wert campus page (FAQ)",
        "publisher": "QTS Data Centers",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "FAQ, Water: answer to 'How much water will this data center campus use?' (third and fourth sentences, continuing 'Since we’re still early in the planning stage for this development'); next FAQ 'What water supply will you be using to initially fill the closed-loop system?' answers 'The City of Van Wert has approved our water usage'",
        "quote": "The closed-loop system that cools the data hall uses only water. We will need to initially charge the system with a one-time fill.",
        "evidence_class": "first_party_operator"
      },
      "confidence": "moderate",
      "establishes": "In the Van Wert campus FAQ, QTS states that the closed-loop system that will cool the data hall is to be charged once with water from a City of Van Wert-approved supply, i.e. the planned cooling design for this campus is closed-loop.",
      "does_not_establish": "As-built cooling (the page says designs are not final and the project is in planning); water use; approvals.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-edged-columbus-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "edged-columbus"
      },
      "dimension": "cooling",
      "value": "closed_loop",
      "scope": "building",
      "source": {
        "url": "https://edged.us/columbus",
        "title": "Edged Columbus — facility specifications",
        "publisher": "Edged US",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Columbus page, Tech Specs → Cooling, 'Advanced Waterless Cooling System' specification list (two consecutive list items; the list also states 'Water Usage Effectiveness (WUE) 0.00 liters/kWh of cooling')",
        "quote": "Glycol heat transfer with rooftop air cooled chillers Closed loop evaporators provide secondary cooling",
        "evidence_class": "first_party_operator"
      },
      "confidence": "moderate",
      "establishes": "The operator's Columbus specification list describes a closed glycol heat-transfer loop with rooftop air-cooled chillers and closed-loop evaporators for secondary cooling at this building.",
      "does_not_establish": "Measured water use; whether 'closed loop evaporators' are refrigerant-side heat exchangers or an evaporative process; workload (the page's fleet-level ThermalWorks sentence is not relied on).",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-meta-gallatin-tn-operating_model-1",
      "subject": {
        "kind": "record",
        "stable_id": "meta-gallatin-tn"
      },
      "dimension": "operating_model",
      "value": "self_operated",
      "scope": "campus",
      "source": {
        "url": "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
        "title": "Gallatin, We Are Online",
        "publisher": "Meta (Meta Data Centers site)",
        "source_date": "2024-11-14",
        "retrieved": "2026-09-24",
        "locator": "Post body, first paragraph",
        "quote": "Gallatin Data Center is now serving traffic. That means this data center is now part of our global infrastructure that brings our technologies and services to life, making it possible to connect billions of people worldwide.",
        "evidence_class": "first_party_operator"
      },
      "confidence": "moderate",
      "establishes": "The operator states this site serves Meta's own global platform services, i.e. self-operated capacity for the operator's own consumer services rather than space leased to others.",
      "does_not_establish": "The word 'hyperscale' is not used; the post does not exclude third-party equipment on site; operating status after November 2024; capacity.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "self_operated_scope": "own_platform_services"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-vantage-oh1-new-albany-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "vantage-oh1-new-albany"
      },
      "dimension": "cooling",
      "value": "closed_loop",
      "scope": "campus",
      "source": {
        "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
        "title": "New Albany, Ohio (OH1) campus page",
        "publisher": "Vantage Data Centers",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "Campus page, 'Cooling' section",
        "quote": "Our OH1 campus will use a highly efficient closed-loop chilled water system generated through air-cooled chillers.",
        "evidence_class": "first_party_operator"
      },
      "confidence": "moderate",
      "establishes": "The operator's stated cooling design for the OH1 campus is a closed-loop chilled-water system with air-cooled chillers and economizers.",
      "does_not_establish": "As-built cooling for each building; water use; which buildings are complete.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-amazon-hobart-sbn520-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "amazon-hobart-sbn520"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "project",
      "source": {
        "url": "https://ecm.idem.in.gov/cs/idcplg?IdcService=GET_FILE&dDocName=83997206&RevisionSelectionMethod=LatestReleased&Rendition=web&allowInterrupt=1",
        "title": "Application for New Source Minor PSD/EO Construction Approval and FESOP, Site SBN520/750 (prepared by Ramboll for Amazon Data Services, Inc.)",
        "publisher": "Indiana Department of Environmental Management, Office of Air Quality (application received July 24, 2026; filed by the applicant)",
        "source_date": "2026-07-24",
        "retrieved": "2026-09-24",
        "locator": "PDF p.5, 2. Project Description; per-site count PDF p.4 ('SBN520 will have one hundred and seventy (170) emergency back-up generators')",
        "quote": "Each emergency generator is composed of two (2) distinct parts, a diesel engine and the associated electric generator.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The pending air application proposes diesel-engine emergency back-up generators at SBN520 (4751 E. 61st Avenue) for use during interruptions in electrical service.",
      "does_not_establish": "Permit issuance; installation; that the site runs on generators; the utility supplier; the application also allows renewable diesel.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-amazon-hobart-sbn750-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "amazon-hobart-sbn750"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "project",
      "source": {
        "url": "https://ecm.idem.in.gov/cs/idcplg?IdcService=GET_FILE&dDocName=83997206&RevisionSelectionMethod=LatestReleased&Rendition=web&allowInterrupt=1",
        "title": "Application for New Source Minor PSD/EO Construction Approval and FESOP, Site SBN520/750 (prepared by Ramboll for Amazon Data Services, Inc.)",
        "publisher": "Indiana Department of Environmental Management, Office of Air Quality (application received July 24, 2026; filed by the applicant)",
        "source_date": "2026-07-24",
        "retrieved": "2026-09-24",
        "locator": "PDF p.5, 2. Project Description; per-site count PDF p.4 ('SBN750 will have six hundred and twelve (612) emergency back-up generators')",
        "quote": "Each emergency generator is composed of two (2) distinct parts, a diesel engine and the associated electric generator.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The pending air application proposes diesel-engine emergency back-up generators at SBN750 (6197 Colorado St.) for use during interruptions in electrical service.",
      "does_not_establish": "Permit issuance; installation; that the site runs on generators; the utility supplier; the application also allows renewable diesel.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-mineral-gap-data-center-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "mineral-gap-data-center"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "building",
      "source": {
        "url": "https://elevatewisecounty.com/top-industries/data-centers/",
        "title": "Data Centers — Wise County Economic Development",
        "publisher": "Wise County Economic Development (Wise County, Virginia)",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "'Mineral Gap: A Proven Model' section",
        "quote": "In 2023, Mineral Gap made history by powering up Virginia's first commercial-scale solar field on previously coal mined land—a 3.6 MW array that provides behind-the-meter electricity to the data center.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "A 3.6 MW solar array supplies behind-the-meter electricity to the Mineral Gap data center (since 2023).",
      "does_not_establish": "That the array sits inside the data-center parcel (the stated relationship is behind-the-meter); share of load; the grid supplier; 3.6 MW is generation, not IT load.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "unstated",
        "fuel": "solar",
        "behind_the_meter": true
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-global-ai-weld-county-co-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "global-ai-weld-county-co"
      },
      "dimension": "cooling",
      "value": "closed_loop",
      "scope": "phase",
      "source": {
        "url": "https://www.weld.gov/Newsroom/2026-News/Weld-County-Commissioners-approve-Global-AI-data-center-permit",
        "title": "Weld County Commissioners approve Global AI data center permit",
        "publisher": "Weld County, Colorado",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "News release, third paragraph (USR26-0019, approved at the September 9 Board meeting)",
        "quote": "The first phase of the project is expected to employ approximately 20 people. It includes a closed-loop, air-cooled cooling system.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The county-approved first phase includes a closed-loop cooling system.",
      "does_not_establish": "As-built or operating cooling; later phases (which require new review); water use.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-global-ai-weld-county-co-cooling-2",
      "subject": {
        "kind": "record",
        "stable_id": "global-ai-weld-county-co"
      },
      "dimension": "cooling",
      "value": "air",
      "scope": "phase",
      "source": {
        "url": "https://www.weld.gov/Newsroom/2026-News/Weld-County-Commissioners-approve-Global-AI-data-center-permit",
        "title": "Weld County Commissioners approve Global AI data center permit",
        "publisher": "Weld County, Colorado",
        "source_date": null,
        "retrieved": "2026-09-24",
        "locator": "News release, third paragraph",
        "quote": "The first phase of the project is expected to employ approximately 20 people. It includes a closed-loop, air-cooled cooling system.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The same approved first-phase system is described as air-cooled (heat rejected to air rather than by evaporation).",
      "does_not_establish": "As-built cooling; later phases; this is the same system as the closed_loop assertion, not a second system.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-stream-stamp-alabama-ny-cooling-1",
      "subject": {
        "kind": "record",
        "stable_id": "stream-stamp-alabama-ny"
      },
      "dimension": "cooling",
      "value": "closed_loop",
      "scope": "project",
      "source": {
        "url": "https://www.gcedc.com/file-library/100319/STREAMUSDataCentersLLC.SEQRDevelopmentApplication.4.6.26.IandII.IntroductionandProjectDescription.pdf",
        "title": "STREAM U.S. Data Centers revised SEQR development application — I & II Introduction and Project Description (April 6, 2026)",
        "publisher": "Genesee County Economic Development Center file library (applicant filing by STREAM U.S. Data Centers, LLC)",
        "source_date": "2026-04-06",
        "retrieved": "2026-09-24",
        "locator": "PDF p.3, II Project Description, water/utilities discussion",
        "quote": "Building cooling will be achieved through the use of closed-loop air-cooled technology. There will be no consumptive water use in the cooling system",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The applicant's filed design for the three proposed buildings uses closed-loop, air-cooled cooling.",
      "does_not_establish": "Approval (the revised 2026 proposal is not approved); as-built design; the applicant statement is not an agency finding.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-stream-stamp-alabama-ny-cooling-2",
      "subject": {
        "kind": "record",
        "stable_id": "stream-stamp-alabama-ny"
      },
      "dimension": "cooling",
      "value": "air",
      "scope": "project",
      "source": {
        "url": "https://www.gcedc.com/file-library/100319/STREAMUSDataCentersLLC.SEQRDevelopmentApplication.4.6.26.IandII.IntroductionandProjectDescription.pdf",
        "title": "STREAM U.S. Data Centers revised SEQR development application — I & II Introduction and Project Description (April 6, 2026)",
        "publisher": "Genesee County Economic Development Center file library (applicant filing by STREAM U.S. Data Centers, LLC)",
        "source_date": "2026-04-06",
        "retrieved": "2026-09-24",
        "locator": "PDF p.3, II Project Description",
        "quote": "Building cooling will be achieved through the use of closed-loop air-cooled technology.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The same filed system is air-cooled (no consumptive water for cooling).",
      "does_not_establish": "Same system as the closed_loop assertion, not a second system; approval; as-built design.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-stream-stamp-alabama-ny-power_counterparty-1",
      "subject": {
        "kind": "record",
        "stable_id": "stream-stamp-alabama-ny"
      },
      "dimension": "power_counterparty",
      "value": {
        "organization": "National Grid",
        "role": "serving_utility",
        "agreement_status": "planned"
      },
      "scope": "project",
      "source": {
        "url": "https://www.gcedc.com/file-library/100319/STREAMUSDataCentersLLC.SEQRDevelopmentApplication.4.6.26.IandII.IntroductionandProjectDescription.pdf",
        "title": "STREAM U.S. Data Centers revised SEQR development application — I & II Introduction and Project Description (April 6, 2026)",
        "publisher": "Genesee County Economic Development Center file library (applicant filing by STREAM U.S. Data Centers, LLC)",
        "source_date": "2026-04-06",
        "retrieved": "2026-09-24",
        "locator": "PDF p.2, 'Energy Strategy' bullet",
        "quote": "The project will require a connection to the utility power grid (National Grid).",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The applicant names National Grid as the utility grid it will connect to for about 500 MW of utility power.",
      "does_not_establish": "A service agreement or interconnection approval for this project (the NYISO approval cited is for the STAMP substation); delivered MW; the exact National Grid legal entity.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-stream-stamp-alabama-ny-power_source-1",
      "subject": {
        "kind": "record",
        "stable_id": "stream-stamp-alabama-ny"
      },
      "dimension": "power_source",
      "value": "grid_utility_service",
      "scope": "project",
      "source": {
        "url": "https://www.gcedc.com/file-library/100319/STREAMUSDataCentersLLC.SEQRDevelopmentApplication.4.6.26.IandII.IntroductionandProjectDescription.pdf",
        "title": "STREAM U.S. Data Centers revised SEQR development application — I & II Introduction and Project Description (April 6, 2026)",
        "publisher": "Genesee County Economic Development Center file library (applicant filing by STREAM U.S. Data Centers, LLC)",
        "source_date": "2026-04-06",
        "retrieved": "2026-09-24",
        "locator": "PDF p.2, 'Energy Strategy' bullet",
        "quote": "The project is estimated to require approximately 500MW of utility power and will utilize existing right-of-way for interconnection and distribution.",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "Planned primary supply is utility power over the grid.",
      "does_not_establish": "Approval; energization; the 500 MW estimate as contracted or delivered load.",
      "author": "claude-classification-lane",
      "qualifiers": {},
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    },
    {
      "assertion_id": "cls-stream-stamp-alabama-ny-power_source-2",
      "subject": {
        "kind": "record",
        "stable_id": "stream-stamp-alabama-ny"
      },
      "dimension": "power_source",
      "value": "onsite_generation",
      "scope": "project",
      "source": {
        "url": "https://www.gcedc.com/file-library/100319/STREAMUSDataCentersLLC.SEQRDevelopmentApplication.4.6.26.IandII.IntroductionandProjectDescription.pdf",
        "title": "STREAM U.S. Data Centers revised SEQR development application — I & II Introduction and Project Description (April 6, 2026)",
        "publisher": "Genesee County Economic Development Center file library (applicant filing by STREAM U.S. Data Centers, LLC)",
        "source_date": "2026-04-06",
        "retrieved": "2026-09-24",
        "locator": "PDF p.2, 'Emergency Backup Power' bullet",
        "quote": "12 Emergency diesel-powered generators will provide backup power, ensuring uninterrupted operations during utility power outages",
        "evidence_class": "primary_official"
      },
      "confidence": "moderate",
      "establishes": "The filed design includes emergency diesel generators for backup only.",
      "does_not_establish": "Air-permit issuance; installation; run-hours.",
      "author": "claude-classification-lane",
      "qualifiers": {
        "generation_purpose": "backup",
        "fuel": "diesel_or_renewable_diesel"
      },
      "status": "published",
      "reviewed_by": "fable-independent-reviewer",
      "reviewed_at": "2026-09-24"
    }
  ],
  "publication": {
    "license": null,
    "reuse_scope": "reference only unless a record is explicitly rights-cleared",
    "rights_manifest": "/data/rights-manifest.json"
  }
}